ARCA logo

Serving Alberta's Roofing Industry Since 1961

ARCA logo

Flashing Details: Open Wall Scupper with Hopper

Detail 14: Open Wall Scupper with Hopper

Scope of Roofing by Roofer

  • 1 vapour retardant
  • 1 optional vapour retardant termination
  • 2 primary insulation
  • 3 secondary insulation
  • 4 fiber cant strip
  • 5 primary membrane and membrane protection
  • 6 metal scupper with hopper
  • 7 membrane flashing
  • 8 metal base flashing
  • 9 metal cap flashing
  • NOTE: Items 8 and 9 may be one piece.

Suggested Details by Others

  • A accepted deck
  • B air/vapour seal
  • C sloped wood blocking
Revised: June 23, 2005